Al Rehman Garden Phase 7 Development Update

Written by

in

Al Rehman Garden Phase 7 continues to see steady on-ground development, with a wide, paved main boulevard and a dedicated security checkpoint at its gateway. The entrance features decorative street poles, landscaped median beds, ornamental urns, and palm trees, while a white circular administrative head office with arched architecture is located near the entry zone alongside commercial storefronts and developer offices. Established Sectors: Blocks A, B, Haider Block, and Adjacent Sectors Underground electrical wiring runs throughout the developed sectors to preserve street aesthetics. Multiple multi-story residences are actively being built with brickwork and concrete slab casting, with reinforced damp-proofing at foundation. Several modern houses are already inhabited, serviced by paved asphalt roads, curbs, and street lighting. Community amenities include central green parks, demarcated open spaces, and an operational white grand mosque in Block B. Dedicated commercial zones along the avenues are active, with several retail structures and multi-story business premises under development. Block A Extension and Commercial Avenues Clear demarcations separate residential sectors and commercial avenues. The sector designates land reserved for educational facilities, including a planned site for The Lahore City School. Plot sizes include commercial frontages measuring two to four marlas along secondary access roads and wide boulevards. Infrastructure Expansion in Block D Road tracing and compaction: Heavy motor graders and vibratory compactors prepare sub-base surfaces along main and connecting streets. Signboard installation: Directional signs such as Block D1 Street 01 and Street 10 mark plot boundaries and street alignments at intersections. Base layer application: Tractor-trailers haul crushed stone and aggregate, graded and water-compacted in readiness for asphalt surfacing. Sewerage alignment: Subterranean drainage lines have been installed, and concrete manhole covers are systematically being brought to ground level in preparation for final road surfacing. Earthworks and Sewerage Progress in Block C Underground drainage: Heavy excavators level trenches and install drainage infrastructure along perimeter and street corridors. Sub-base preparation: Material trucks unload crushed stone aggregate; graders and rollers shape primary pathways into uniform roadbeds. Future road links: Graded paths connect internal sector routes to government-access roads and external boundaries. Throughout Block C and Block D, central green medians along wide avenues have been filled with topsoil in preparation for landscaping, curbs, and paved footpaths once asphalt carpet laying commences.

کیا آپ رئیل اسٹیٹ مارکیٹ کے تازہ ترین رجحانات سے باخبر رہنا چاہتے ہیں؟
محفوظ اور منافع بخش سرمایہ کاری کے فیصلوں کے لیے ہمارا آفیشل واٹس ایپ چینل آج ہی فالو کریں! ہم آپ تک پہنچاتے ہیں مارکیٹ کی درست ترین معلومات اور بروقت تجزیات۔ 📈✨

👇 ابھی ہمارے چینل کا حصہ بنیں:
https://whatsapp.com/channel/0029Va8D7O511ulLB3FgCK0u

Choudry Mujahid Yasin (CMY ) Owner of LahoreRealEstate.Com
https://wa.me/923224929992 Direct message to me now