LDA City Development Update:. Roads & Block Overview

The visual survey focuses on central infrastructural corridors, notably the 75-foot-wide roadway, adjacent residential blocks, and major surrounding avenues that connect the sector to key regional routes. The 75-foot-wide road serves as a primary axis through this sector of the development. As shown in the footage, substantial portions of this roadway feature complete carpeting and defined central medians, demonstrating significant progress in internal transit capability.

The corridor is flanked by newly laid curbs and planned green belts, serving as a central conduit between major sectors. Active construction work continues at intersections, bridging secondary branch roads with main transit arteries to ensure smooth connectivity throughout the community. On either side of the 75-foot road lie prominent residential sectors, labeled as L Block and K Block.

In L Block, extensive land leveling, demarcated street layouts, and internal road networks are clearly visible. The grid layout reveals individual plot divisions, internal lanes, and curved access paths tailored for residential living. A towering overhead water reservoir stands completed in the background of L Block, indicating advancements in essential utility and water supply infrastructure.

Ground preparation continues across various sub-sectors, with defined cul-de-sacs and neighborhood streets ready for future housing development. Directly across the 75-foot road sits K Block, which shows comparable progress in ground leveling, boundary marking, and internal access corridors. The footage clearly illustrates the parallel positioning of K Block and L Block along the central spine, establishing a balanced master plan.

In addition, an area dedicated to H Block Commercial is marked adjacent to the main access routes, highlighting designated commercial zones planned to serve incoming residents with localized retail, services, and commercial amenities. The development expands further toward key perimeter roads, highlighted by the intersection with Sutluj 150 Ft Road and Jhelum 300 Ft Road. The Jhelum 300 Ft Road represents one of the largest transit arteries within the master plan, built to accommodate heavy traffic flows and ensure seamless transit across the wider metropolitan area.

Its intersection with the 150-foot-wide Sutluj Road creates a major traffic junction, where asphalt carpeting, lane divisions, and elevated road sections are advancing toward full completion. Connectivity is further enhanced by links toward Pine Avenue Road and adjacent developments such as Etihad Town Phase 3. The presence of Pine Avenue Road along the boundary ensures direct access to surrounding transit corridors, reducing travel times to neighboring districts.

The neighboring layout of Etihad Town Phase 3 underscores the growing urban density and rapid development taking place across this entire sector. Overall, the footage illustrates steady progress in road surfacing, civil works, and utility setup. From the broad expanse of the 300-foot Jhelum Road to the well-defined internal streets of L Block and K Block, the area continues to transition into an organized urban community.

Recent aerial footage provides an extensive look at the ongoing development and infrastructural progress across LDA City. The bird's-eye perspective highlights the transformation of the landscape as wide thoroughfares, residential plots, and commercial sectors take shape.

Contact information
Name: Choudry Mujahid Yasin ( CMY )
Phone: +923224929992 Whatsapp Available