Tag: Lahore Real Estate Investment

  • Ittehad Town Phase 4: Map, Prices and Risks

    Ittehad Town Phase 4 presents an appealing master plan and a staged payment option, but buyers should look beyond the map and booking price. Its location is relatively remote, the approval described in the market briefing is technical rather than final, and the advertised plan appears larger than the area covered by that approval. These points make document checks and a realistic estimate of total cost essential.

    Location and access: an outer Lahore project

    Phase 4 is planned along Chenab Road, beyond the developed edge of LDA City. The briefing describes Chenab Road as a route connecting with LDA City and continuing towards the Ring Road. It also places the scheme about four kilometres from Ferozepur Road and five kilometres from the Ring Road. Thokar Niaz Baig and the airport are each described as roughly 30 kilometres away, making the location more relevant to South Lahore than to people seeking easy access to the city centre.

    The project is not directly on Pine Avenue; the briefing puts it around 400 metres away. It anticipates possible future connections with earlier phases, but those should not be treated as existing access. For a buyer, the distinction between a road shown on a plan and a road that is built, connected and usable is important. The location’s value depends substantially on the delivery of planned public-road links.

    What the proposed map shows

    The map presents eight residential blocks, labelled G1 through G8, alongside commercial areas and civic facilities. The main routes shown include a 300-foot Jhelum Road, a 200-foot Chenab Road and a 150-foot structure-plan road between blocks G6 and G7. The internal network includes roads of 80 feet, as well as narrower 50-, 40- and 35-foot streets. The briefing stresses that these major roads are government projects rather than roads delivered by the scheme itself.

    The plan also depicts a financial district near Jhelum Road and a central business area, with commercial strips along both sides of Chenab Road. Parks are marked in the blocks, along with a children’s park, a mosque, a disposal facility and space for waste management. Plot sizes vary by location: five-marla plots are indicated in G6, G7 and G8; G2 includes one-kanal plots; and two-kanal plots are shown across Chenab Road. The map also marks a one-kanal line through the G7 and G8 area and another near G2.

    Future extensions and land shown as plot banks

    A substantial grey portion of the map is labelled as future extension land, including much of the area associated with G1 and G4. The briefing says detailed planning is not shown there. Buyers should therefore distinguish the plotted, described sections from land presented as a possible later extension. A large master plan does not by itself establish when every area will be approved, serviced or available for possession.

    Pink areas are identified as plot banks held as security. The map is described as showing approximately 111 kanals for the authority’s plot bank and around 70 kanals for the sponsors’ plot bank, or roughly 180 kanals combined. These figures matter when compared with the approval area discussed below, but they do not independently establish the legal status of each residential or commercial block.

    Approval status needs careful verification

    The briefing describes the available document as a technical approval covering approximately 261 kanals, not a final approval. It says the authority would issue a final layout plan only after specified conditions were met. That distinction is central: technical approval should not be assumed to mean that every block on the displayed map is finally approved, that development can proceed throughout the map, or that sales have formal permission.

    The map’s plot-bank areas alone are estimated at about 180 kanals. That leaves roughly 80 kanals of the stated approved area for the blocks, commercial districts, parks and roads identified in the plan. This comparison raises a practical question: which exact parts of the displayed plan fall within the approved boundary? Buyers should request a clear, current layout plan that identifies approved land and plot locations, rather than relying on a broad marketing map.

    The briefing also reports that the approval document required a penalty of Rs 600,000 in connection with advertising and sales that had begun before approval. It says the document cautioned that technical approval should not be treated as permission for development, marketing, sale or publicity until formal permission was obtained. Because such conditions can change a buyer’s legal and financial exposure, the relevant documents should be checked directly and independently before any payment.

    Questions to get answered in writing

    • Has final approval been granted, and can the approved layout plan be inspected?
    • Does the specific block and plot number fall inside the approved boundary?
    • Is formal permission for sales in place, separate from technical approval?
    • What is the documented status of future-extension land?
    • Are the plot’s ownership and land records clear, and do they match the project documents?
    • What development charges, possession conditions and payment obligations apply?

    Ask for written answers and retain copies of the documents. Verbal assurances, a map image or a booking receipt are not substitutes for confirmation of the plot’s legal and approval status.

    Nearby land questions remain unresolved

    The briefing discusses uncertainty about whether land associated with Green Palms, Model City and Lahore Garden may be included in or connected with Phase 4. It presents these possibilities as speculation, not confirmed changes. It also notes that Green Palms has reportedly seen prolonged inactivity and that market views about its prospects are mixed. Regarding Lahore Garden, the briefing refers to its past inclusion on an illegal-schemes list and says concerns remain about the status of land at the edge of Phase 4.

    These are not details a buyer should resolve through rumours. Before selecting a plot, establish exactly which parcel it occupies, who controls that land, whether it belongs to the approved project area and whether any earlier claims or disputes affect it. If an adjacent scheme or future merger is mentioned, ask for documentary evidence and a clear explanation of what would happen to existing plot holders. Until verified, treat such possibilities as uncertainty rather than a benefit.

    Indicative prices and payment structure

    The figures reported for residential plots are land prices; development charges are additional, and their amount had not been announced in the briefing. The quoted prices are approximately Rs 62 lakh for five marla, Rs 1.10 crore for 10 marla, Rs 2.05 crore for one kanal and Rs 3.90 crore for two kanal. Commercial prices were not publicly available in the information reviewed.

    The described instalment plan runs for three years. It includes a 20% down payment, 30 monthly instalments of about 1% of the total price each, four balloon payments of 5%, a 10% payment at balloting and 20% at possession. On a five-marla plot, the stated down payment is about Rs 12.5 lakh and monthly instalments are around Rs 62,000. Buyers should check the actual schedule and definitions in the current written offer, since payment milestones and additional charges affect the real commitment.

    Development charges had not been confirmed. The briefing cites a market estimate of more than Rs 20 lakh for a five-marla plot, drawing a comparison with charges reportedly paid in Phase 2. On that estimate, the five-marla cost could reach roughly Rs 80–90 lakh before considering other costs that may apply. This is an estimate, not a confirmed charge. Ask for an official, itemised schedule and avoid basing affordability on the land price alone.

    How the price compares with developed areas

    The briefing compares Phase 4 with several Lahore options. In LDA City, five-marla plots are described as ranging from about Rs 45 lakh to Rs 95 lakh depending on block and location, with possession available in some areas. In the nearby F Block, the stated range for fully paid five-marla plots is around Rs 75–80 lakh, while some other blocks are quoted as lower and a C Block example is around Rs 90 lakh. The comparison highlights the value of existing development and the ability to build in areas where possession has been granted.

    For Central Park, the briefing gives an approximate five-marla range of Rs 61–65 lakh and a 10-marla range of roughly Rs 1.11–1.20 crore. Developed blocks in Palm City are described at around Rs 60–90 lakh for five marla. Along Raiwind Road, the cited range is approximately Rs 50–85 lakh. These are indicative figures from the briefing, not verified current offers, and prices can vary by block, plot position, payment status and possession.

    At first glance, a Rs 62 lakh booking price may appear competitive. Once estimated development charges are added, however, the projected Rs 80–90 lakh total for five marla can overlap with prices in areas that already have development or possession. The comparison is not simply between two plot prices: it is between an instalment-based, future-delivery proposition and a potentially more developed location where a buyer may be able to build sooner.

    Benefits, risks and a practical decision framework

    Potential advantages

    • The proposed map includes a broad road network, parks, commercial areas and community facilities.
    • The three-year instalment structure may suit buyers who cannot pay the full amount upfront.
    • The briefing points to a delivery record in earlier phases, while noting that past performance cannot guarantee the outcome of a new phase.
    • The technical approval described in the briefing is a relevant step, provided buyers understand that it is not final approval.

    Material risks

    • The site is distant from central Lahore and depends on planned road connections for improved access.
    • Major routes shown on the map are described as government projects, so their timing and completion are outside the scheme’s direct control.
    • The approval discussed covers about 261 kanals, while the displayed plan appears to include a much larger area and future extensions.
    • The document is described as technical approval, with formal sales and final layout permissions still needing verification.
    • Development charges are unknown, so the final cost may be materially higher than the booking figure.
    • Questions about adjacent land and the exact project boundary could affect a plot’s status and future use.
    • Possession is not available now; the briefing presents a multi-year wait and says the wider area may take several years to become established.

    For a buyer able to accept uncertainty and pay over time, Phase 4 may warrant further investigation, but only after the plot is confirmed in writing as part of the approved area and all permissions are checked. A buyer prioritising an immediate build or lower development risk may prefer to compare plots with possession in LDA City, Central Park, Palm City or available portions of earlier phases. The right choice depends on time horizon, liquidity, tolerance for approval risk and the full cost after charges—not just the headline instalment.

    Bottom line for prospective buyers

    Phase 4’s map is ambitious, and the staged plan can make entry appear accessible. Yet the project’s remote position, reliance on planned roads, approval gap, uncertain development charges and questions about boundary land all call for caution. Treat the map as a proposal until the final documents establish what is approved and deliverable. Before booking, verify the exact plot, obtain the approved plan and sale permissions in writing, confirm every charge, and compare the total cost with developed alternatives. A lower initial payment is useful only if the underlying land, approvals and delivery terms are clear.


    Stay Ahead in the Real Estate Market

    Want real-time updates on property trends, market insights, and investment opportunities? Join our WhatsApp Channel today:

    https://whatsapp.com/channel/0029Va8D70511uLBB3FgCK0u

    Choudry Mujahid Yasin (CMY)
    Owner, LahoreRealEstate.Com

    Have a question or looking for personalized guidance? Message directly on WhatsApp:

    +923224929992

    Lahore Real Estate business card for Choudry Mujahid Yasin
  • Saul City Lahore: Location and Buyer Risks

    Saul City draws attention for its position near major Lahore growth corridors, but location alone cannot establish whether a plot is approved, transferable or likely to be delivered on time. A recent market briefing presents both sides of the picture: strong access and visible land activity, alongside unresolved questions about approvals, earlier allotments and claims circulating in the market. Buyers should assess each point separately and verify it in writing before committing funds.

    Why the location attracts interest

    The scheme is described as being on Jia Bagga Road, near Pine Avenue and the Lahore Ring Road. The briefing also places it close to Raiwind Road and established or developing areas including LDA City, Ittihad Town and Lake City. Lake City is described as roughly two to three kilometres away. These nearby routes and communities help explain why the location is viewed as a major positive.

    Road access can make a peripheral site more convenient and can encourage development in its surroundings. Pine Avenue is a particular focus in the market discussion: the scheme is said to have an entrance facing the avenue, and its proximity is often used to support optimistic expectations about future demand. The Ring Road is also relevant because it connects different parts of Lahore and has contributed to outward urban expansion.

    However, access should not be confused with delivery. A nearby road does not establish that a specific plot falls within an approved layout, that the land is available for allotment, or that possession will be provided by a particular date. Buyers need to confirm the exact location of the plot against an authoritative, approved plan rather than relying on a general location map or an entrance visible from a road.

    How the earlier scheme affects the story

    The briefing traces Saul City’s background to a housing scheme in the Jia Bagga area that was first associated with a university-town name and later referred to as a third phase. It says people, including university staff, bought files but did not receive plots as expected. In a court proceeding described in the briefing, the university disputed that the scheme belonged to it and said its name had been used in connection with a private project.

    The account says a later arrangement was presented under which members of the earlier scheme would receive plots in Saul City without paying an additional amount, in connection with the transfer of land to a developer. It also says an inquiry was closed and the development authority was asked to ensure that members received plots. These are consequential claims, but the briefing does not establish that every affected member was ultimately allotted land or that the arrangement has been completed.

    That distinction matters to a new buyer. A commitment made to people from an earlier scheme may affect land, allocation capacity and expectations about which plots can be offered to later purchasers. It is not enough to hear that previous members will be accommodated; buyers should ask for verifiable evidence of how those claims have been resolved and whether the plot being offered is free of competing claims.

    Approval coverage needs close examination

    The briefing describes Saul City as having technical approval for only part of its stated area. It refers to a total scheme area of about 6,000 kanals and technical approval covering approximately 1,800 to 1,900 kanals, or around 30 percent. It further notes that a complete scheme map was not visible on the development authority’s website at the time discussed. These figures and observations should be checked against current official records before being relied on.

    Technical approval for a portion of land is not the same as approval for every block or plot promoted under a scheme. A marketing map may show a larger proposed layout than the area covered by an official approval. The relevant question is therefore not simply whether the scheme has received some approval, but whether the particular land and plot number in a proposed transaction are included in the approved area.

    The briefing also describes a show-cause notice issued by the authority over matters including development work carried out before final approval and the scheme’s expansion into land associated with the earlier project. It raises allegations about questionable letters and stamps presented to affected members. The account does not provide a confirmed outcome for these matters, so it would be inaccurate to treat the allegations as proven or to assume they have been resolved. Buyers should seek official documentation and independent legal review.

    What to verify about a plot

    • Approval: Confirm whether the exact parcel and plot appear in an official, current approved plan.
    • Land status: Check ownership records and whether the land has been transferred or is subject to competing claims.
    • Allotment: Establish which legal entity will issue the allotment and whether the seller has the right to transfer the file or plot.
    • Development: Distinguish visible site activity from completed infrastructure and formal possession.

    Legacy members and unresolved expectations

    The briefing refers to around 900 families who have reportedly waited for plots for years in connection with the earlier scheme. It also describes an inquiry committee report that identified administrative, financial and legal shortcomings and recommended a forensic audit of transactions, verification of land records and legal examination of disputed allotments. The report was expected to go before the court, while a separate legislative move reportedly raised concerns about payments made to the developer and limited work on the ground.

    These details relate primarily to the earlier scheme, rather than establishing that every issue concerns every Saul City plot. Still, the stated promise to accommodate earlier members links the two histories. Until the status of those claims is clear, a prospective buyer should ask how existing obligations affect the land and inventory being marketed. The number of people awaiting plots, if confirmed, is not just background: it may be relevant to the credibility of allocation promises and the sequence in which plots are assigned.

    Because the briefing does not report a final resolution, buyers should avoid drawing either an all-clear conclusion or a definitive legal judgment from it. The practical response is to treat the outstanding questions as due-diligence items. Request primary documents, check them with the relevant authority and consult a property lawyer who can assess the specific transaction.

    Prices, payment plans and market rumours

    The briefing gives historical and reported market figures, but they are not interchangeable. It says that at the scheme’s launch, a five-marla plot was priced at about 3.7 million rupees, a 10-marla plot at about 7 million rupees and a one-kanal plot at roughly 12.5 million rupees. It later describes a deal in which a five-marla plot was around 4 million rupees, while a current market discussion placed it near 6.5 million rupees.

    A newer payment plan was also reported in the market: approximately 5.6 million rupees for five marla, 10 million for 10 marla and 19 million for one kanal, with a 20 percent down payment and instalments over about two and a half years. These are reported offers, not a guarantee of an available plot, an official price list or a completed transaction. Buyers should obtain the current terms directly in signed documents and confirm what fees, development charges or other costs may apply.

    The briefing contrasts advertised or developer-quoted rates with asking prices seen on property websites, where five-marla listings were described as ranging from about 2.2 million to 3.5 million rupees. Listing prices may not reflect completed sales, and a file’s asking price is not necessarily the value of an approved, transferable plot. Differences can reflect plot status, payment history, transfer conditions and seller expectations. Compare like with like, and do not treat a projected increase to 6.5 million rupees as evidence that a buyer can resell at that amount.

    Some market claims suggest that prices may rise, old files may be bought back, a ballot may take place, or a new phase may be introduced near Pine Avenue. The briefing says it had not seen authentic documentation confirming these claims. Treat them as speculation unless an authorized party publishes clear written terms and the relevant approvals can be verified. A proposed future launch does not itself resolve the status of existing files or establish that a plot is available.

    Development on the ground is not the same as possession

    Site activity is reported across a substantial area, including land levelling and earthen roads. A mosque was also described as under construction. Those observations can indicate activity, but they should not be presented as proof that the scheme’s promised infrastructure is complete or that a buyer can take possession. The briefing characterizes the visible work as largely involving earthworks and basic access rather than a clear step-change in completed development.

    Plans and marketing material have reportedly referred to features such as a prominent entrance, a clock tower, musical fountains, a hospital, schools and a sports complex. These are proposed or promoted features in the account, not confirmed completed facilities. Before paying a premium based on an amenity, ask whether it is shown in an approved plan, included in a binding commitment and supported by a realistic delivery schedule.

    Possession dates deserve particular scrutiny. The briefing questions a market claim of possession in 2027 because the reported instalment plan extends for about two and a half years. It does not identify a confirmed written promise that would settle the matter. Buyers should ask who is legally responsible for providing possession, what conditions must be met first and what remedy is available if the stated date is missed. Verbal assurances are poor substitutes for clear contractual terms.

    Four questions to ask before booking

    1. Who is issuing the allotment? Ask which registered legal entity will appear on the allotment documents and verify that entity’s authority to sell and transfer the plot.
    2. Is this exact land approved? Request the authority-approved map and identify the plot on it. Confirm that the specific land, not merely part of the wider scheme, is covered.
    3. What written commitment covers possession? Ask who will provide possession, by what stated conditions or date, and what the contract says if delivery does not occur.
    4. What happens to an older file? If buying an existing file, obtain written confirmation of its eligibility for any ballot or allocation, its transfer procedure and any outstanding payments.

    Do not accept an unclear map, an informal promise or a claim that paperwork will be supplied later as an adequate answer. Have the allotment documents, land record, payment schedule and transfer terms reviewed before paying. Keep receipts and copies of every written representation, and ensure that the person receiving funds is authorized to do so.

    A balanced way to assess the opportunity

    Saul City’s strongest stated advantage is its location near Pine Avenue, the Ring Road and growing parts of Lahore. Its proximity to established and developing communities may support long-term interest. The reported technical approval for part of the area and the existence of a payment plan may also attract buyers. Neither point, however, answers the key questions about the remaining land, the older members’ claims, the outcome of regulatory concerns or the timing of possession.

    The future described in the briefing depends on several developments: whether approval is obtained for the rest of the land, how the court addresses the earlier scheme’s disputes, and whether promised allocations are formally completed. Positive outcomes could strengthen confidence in a well-located project; unresolved or adverse outcomes could leave buyers exposed despite the surrounding road network. These are contingencies, not predictions.

    A buyer with funds set aside for a long holding period may decide to investigate further, provided the documents withstand independent checks and the potential loss is manageable. Someone relying on life savings, needing a home soon or unable to tolerate delays should be more cautious. Compare alternatives on the basis of verified plot status, infrastructure and possession evidence, rather than choosing solely because a location is popular or an advertised rate appears likely to rise.

    Ultimately, the essential distinction is between a promising location and a secure transaction. Before booking in Saul City, verify the legal entity, the exact approved land, the chain of transfer and the written terms for ballot and possession. If answers remain vague, pause. A plot purchase should rest on documents and confirmed rights, not on an expectation that unresolved matters will eventually work out.


    Stay Ahead in the Real Estate Market

    Want real-time updates on property trends, market insights, and investment opportunities? Join our WhatsApp Channel today:

    https://whatsapp.com/channel/0029Va8D70511uLBB3FgCK0u

    Choudry Mujahid Yasin (CMY)
    Owner, LahoreRealEstate.Com

    Have a question or looking for personalized guidance? Message directly on WhatsApp:

    +923224929992

    Lahore Real Estate business card for Choudry Mujahid Yasin
  • Union Town Lahore Homes and Location Guide

    Choosing a home near Lahore’s southern growth corridors involves more than comparing floor plans or payment schedules. Access to major roads, nearby neighborhoods and everyday services can shape both the practicality of living in a property and its longer-term appeal. A recent market briefing describes four-marla townhouses in Union Town, near Thokar Niaz Baig and Pine Avenue, and outlines the location, home layout and installment-based purchase option.

    How Union Town fits into Lahore’s southern corridor

    The location discussed is close to Chattar Chowk, where Pine Avenue connects with surrounding parts of the city. The briefing places the society within reach of Thokar Niaz Baig and describes a wider cluster of established residential areas, including Johar Town, Wapda Town, Valencia Town and several phases of Etihad Town. This context may be useful to buyers comparing neighborhoods, although proximity alone does not establish travel times or guarantee convenient access from a particular plot or home.

    The route described also links the area toward the Expo Centre and Ayub Chowk, while Pine Avenue is presented as a developing urban corridor with commercial activity and connections extending toward Ferozepur Road. Nearby roads and established destinations can support access across a broad part of Lahore. For a prospective resident, however, the value of that connectivity depends on the exact entrance, route conditions, distance to daily services and the hours when travel is needed.

    The briefing also refers to educational, medical and commercial destinations in the wider area, as well as access toward the M-2 motorway. These references provide general geographic orientation rather than a measured assessment of distance. Buyers should map the specific property against the places they expect to visit regularly and verify routes in person before making a decision.

    Townhouse format and payment structure

    The offer described centers on four-marla, three-storey townhouses, with separate accommodation arranged across the ground, first and second floors. The stated layout provides two bedrooms on each floor, together with a kitchen and living space. A buyer may consider an entire townhouse or, subject to the sale terms, an individual floor. The briefing also mentions features such as a lift, barbecue space, storage and a terrace or sitting area; purchasers should confirm which features apply to the specific unit and whether they are included in the written agreement.

    A payment period of two and a half years is presented for the townhouse offer. The briefing gives examples of booking amounts and monthly installments for different floors, but the figures are not sufficiently clear to treat as a reliable current price schedule. They should not be used as a substitute for a written quotation. Before paying a booking amount, ask for the complete price, installment calendar, applicable charges, construction milestones and consequences of late or missed payments.

    Questions to settle before booking

    • Confirm the unit: Establish whether the purchase is for the full house or a particular floor, and identify its precise location and boundaries in the approved plan.
    • Get a complete cost sheet: Request the total price and a breakdown of booking, installments, taxes, utility connections and any other charges.
    • Clarify delivery terms: Obtain written details on construction status, expected handover, finishing specifications and remedies if the stated schedule changes.
    • Check the documentation: Independently verify ownership, approvals, transfer arrangements and the seller’s authority to offer the unit.
    • Inspect the property: Review access, ventilation, room dimensions, shared areas, lift arrangements and the quality of visible construction.

    Who may find the location worth considering?

    The briefing frames the homes for both owner-occupiers and buyers considering an investment. People currently renting may value the possibility of purchasing a defined portion of a multi-storey home, while households relocating from smaller cities may be comparing access to Lahore’s residential districts and road network. A separate-floor arrangement may also suit buyers whose budget or household needs do not require an entire townhouse. Whether it is suitable depends on the legal structure of floor ownership, privacy, utilities and the management of shared spaces.

    For investors, the location’s connections and the presence of nearby residential communities may be relevant factors to investigate. The briefing characterizes Pine Avenue as a corridor attracting investment and commercial development, but future growth and property values are uncertain. Road access, planned activity or rising interest should not be treated as proof that a particular unit will appreciate or be easy to resell. An investment assessment should include the purchase cost, ongoing charges, expected holding period, resale conditions and realistic rental demand for the specific unit.

    Price claims need independent verification

    The market briefing gives broad comparison points for other Lahore homes: it describes five-marla double-storey houses as ranging from about three crore to three and a half crore rupees, and three-marla houses as roughly two crore to two crore thirty lakh rupees. These are reported figures, not verified valuations or guaranteed market rates. The briefing does not provide enough detail about the properties, transaction dates, condition or exact locations to make them directly comparable with a Union Town townhouse.

    It also recounts an earlier sale of a similar floor for about ninety-five lakh rupees and a later indicative value of around one crore twenty-five lakh rupees. That account should be treated as an unverified example, not evidence of a typical return. Differences in unit position, construction, documentation and market conditions can materially affect value. Buyers should compare recent, independently confirmed transactions for genuinely similar units and distinguish asking prices from completed sales.

    A practical way to assess the opportunity

    Start by visiting the property and testing the journeys that matter to your household, rather than relying only on a location description. Review access to work, schools, healthcare and shopping at the times you are most likely to travel. Then compare the townhouse with alternatives in nearby areas, including the amount of space, the ownership structure, construction quality and full cost over the payment period.

    Finally, make the decision from verified documents and a written payment schedule, not from projected appreciation or a verbal description of future commercial growth. Union Town’s position near Thokar Niaz Baig and Pine Avenue may appeal to buyers seeking a home in Lahore’s southern corridor, while the multi-floor layout and installment option may broaden the ways a purchase can be considered. Careful checks on location, legal status, specifications and affordability are essential before committing.


    Stay Ahead in the Real Estate Market

    Want real-time updates on property trends, market insights, and investment opportunities? Join our WhatsApp Channel today:

    https://whatsapp.com/channel/0029Va8D70511uLBB3FgCK0u

    Choudry Mujahid Yasin (CMY)
    Owner, LahoreRealEstate.Com

    Have a question or looking for personalized guidance? Message directly on WhatsApp:

    +923224929992

    Lahore Real Estate business card for Choudry Mujahid Yasin